El Alto Hydroelectric Micro Power Plant

Power Generation Project

El Alto Hydroelectric Micro Power Plant

1.226 kW (IN OPERATION SINCE OCTOBER 2023)

← Back to Projects

EPC Contract (Engineering, Procurement, and Construction): comprehensive execution of civil works, installation of penstock piping, construction of the powerhouse structure, and design, manufacturing, supply, transport, assembly, testing, and commissioning of electromechanical equipment (turnkey project):

Technical Description of the Project:

  • Civil Works: Design and construction of the powerhouse, tailrace channel, substation, grounding network, and anchor blocks/saddles for the penstock.
  • Penstock: Supply, assembly, and commissioning of ASTM 516-70 steel piping with ASTM 572-50 supports and aeration pipe.
  • Steel Structure: Powerhouse with enclosures, gate, windows, staircase, ventilation grating, and hoist support structure.
  • Steel Gate: Design, supply, fabrication, transport, and installation of a gate measuring 3400” x 2500”.
  • Electromechanical Equipment: Horizontal Francis turbine, three-phase synchronous generator, intake valve, HPU unit, speed governor, SCADA system, and flow meter.
  • Auxiliary Electrical Systems: Transformer (0.48/13.8 kV), medium-voltage switchgear, interior/exterior LED lighting, and AC/DC distribution system.
  • Auxiliary Systems: Ventilation (exhaust fans), fire protection (detectors, extinguishers), drainage (pump and sensor), and overhead crane (10 t).
  • Substation and Communications: 13.8 kV line, fiber optic, 480 kVA service connection, telephony, IP CCTV, and short-circuit/protection studies.
  • SCADA Integration: Signal connection to the SCADA system of El Alto Hydroelectric Plant and Dominical Substation, with commissioning at the National Dispatch Center (CND).

Engineering and Supervision Services:

Project Management: Leadership, planning, and coordination of electromechanical activities, including progress monitoring and quality management in engineering, assembly, commissioning, and connection to the National Power Grid.

Electromechanical Engineering: Design and integration of equipment.

Quality Supervision: Equipment quality control, performance testing, and certification.


Project Features

Francis turbines and synchronous generators optimized for maximum efficiency and stability in power generation.

FRANCIS TURBINE with horizontal shaft; runner mounted directly on the generator shaft; adjustable guide vanes; designed for the following parameters:

ParameterSymbolValueUnit
Max intake elevation 635 masl
Nominal intake elevation 634 masl
Min intake elevation 630 masl
Turbine centerline elevation 601.525 masl
Nominal tailrace channel elevation 600 masl
Plant latitude 8.778 °
Water temperature T 10 °C
Max gross head Hbmax 35 m
Nominal gross head Hbn 34 m
Min gross head Hbmin 30 m
Max net head Hnmax 34 m
Nominal net head Hnn 33 m
Min net head Hnmin 28.6 m
Head loss coefficient k 0.0625 m/(m3/s)2
Specific speed Ns 381.7 rpm
Number of units Qty 1 pcs
Turbine flow Qt 4 m3/s
Water density rv 999.4 kg/m3
Gravity g 9.7797 m/s2
Runner outside diameter D 0.766 m
Speed N 720 rpm
Runaway speed Npob 1.710 min-1
Max turbine power Pmax 1.226 MW
Nominal turbine power Pnom 1.191 MW
Min turbine power Pmin 1.028 MW
Axial force Fr max 84 kN
Max radial force Fr max 10.5 kN
Parameter
Max intake elevation
Symbol
Value
635
Unit
masl
Parameter
Nominal intake elevation
Symbol
Value
634
Unit
masl
Parameter
Min intake elevation
Symbol
Value
630
Unit
masl
Parameter
Turbine centerline elevation
Symbol
Value
601.525
Unit
masl
Parameter
Nominal tailrace channel elevation
Symbol
Value
600
Unit
masl
Parameter
Plant latitude
Symbol
Value
8.778
Unit
°
Parameter
Water temperature
Symbol
T
Value
10
Unit
°C
Parameter
Max gross head
Symbol
Hbmax
Value
35
Unit
m
Parameter
Nominal gross head
Symbol
Hbn
Value
34
Unit
m
Parameter
Min gross head
Symbol
Hbmin
Value
30
Unit
m
Parameter
Max net head
Symbol
Hnmax
Value
34
Unit
m
Parameter
Nominal net head
Symbol
Hnn
Value
33
Unit
m
Parameter
Min net head
Symbol
Hnmin
Value
28.6
Unit
m
Parameter
Head loss coefficient
Symbol
k
Value
0.0625
Unit
m/(m3/s)2
Parameter
Specific speed
Symbol
Ns
Value
381.7
Unit
rpm
Parameter
Number of units
Symbol
Qty
Value
1
Unit
pcs
Parameter
Turbine flow
Symbol
Qt
Value
4
Unit
m3/s
Parameter
Water density
Symbol
rv
Value
999.4
Unit
kg/m3
Parameter
Gravity
Symbol
g
Value
9.7797
Unit
m/s2
Parameter
Runner outside diameter
Symbol
D
Value
0.766
Unit
m
Parameter
Speed
Symbol
N
Value
720
Unit
rpm
Parameter
Runaway speed
Symbol
Npob
Value
1.710
Unit
min-1
Parameter
Max turbine power
Symbol
Pmax
Value
1.226
Unit
MW
Parameter
Nominal turbine power
Symbol
Pnom
Value
1.191
Unit
MW
Parameter
Min turbine power
Symbol
Pmin
Value
1.028
Unit
MW
Parameter
Axial force
Symbol
Fr max
Value
84
Unit
kN
Parameter
Max radial force
Symbol
Fr max
Value
10.5
Unit
kN