Baitún Hydroelectric Power Plant

86 MW (IN OPERATION SINCE DECEMBER OF 2012)

← Back to Projects

Design, manufacturing, supply, transport, erection, tests and commissioning of the main and auxiliary Electromechanical Equipment (Turnkey package of the electromechanical part of the Project).

  • Francis-type Turbine, vertical shaft, Governor with Oil-hydraulic Unit, Three-phase Synchronous Generator, Excitation System, Butterfly Valve, SCADA, Electrical and Control Equipment, Tool set and Erection accessories.
  • Grounding network in the house and Grounding panels for the Generating Unit, Lifting mechanisms (Hoist with its travel beam), Fire protection System (detection, alarm and extinguishers).
  • Electromechanical and Integration Engineering of the equipment.
  • Electromechanical Direction and Coordination.
  • Progress Control and Quality Management.
  • Electrical and Mechanical Auxiliary equipment.
  • Erection and Commissioning.
  • Supply and Operation of the equipment for the Transmission Lines and Substation of the Interconnection to the National Electric Network of the Republic of Panama.

Project Features

Francis turbines and synchronous generators optimized for maximum efficiency and stability in power generation.

Two complete vertical shaft Francis hydraulic turbines with the following parameters:

Underground 2
Type Francis vertical shaft
2 Francis-type Units Hndis=128.7 m
Rated Capacity P=44.3 MW
Rated Speed 400 rpm
Underground
2
Type
Francis vertical shaft
2 Francis-type Units
Hndis=128.7 m
Rated Capacity
P=44.3 MW
Rated Speed
400 rpm